The opportunity is a Marginal Field located onshore within PPL 202, 35km SW of Port Harcourt and 18km NE of Soku field. The block is bounded by highly prolific assets to the
north, south, east and west by Idama field, Buguma Creek, Nembe/Okoroba field and Egbema Field.
The 2005 farmor reserve summaries corroborated with the 2010 DPR Certified P2 Reserves indicate STOIIP of 296 MMbbls, with 88 MMbbls ultimate recovery and GIIP of 184 bcf, with 76 bcf ultimate recovery. The Egbolom Oil and Gas Marginal Field has a potential production capacity of 25,000BOE/day production at a plateau. The oil is typically light, with crude API ranges between 300 and 400 API.